Forum Last Topics
- 06/02/2012 23:10 Second-rate Like Schemer Handbags Dealing with Self-ruling S (cartiassivas)
- 06/02/2012 21:50 Low-cost Matched Artist Handbags Purchasing with Give accept (cartiassivas)
- 06/02/2012 20:31 Low-cost Carbon reproduction Hinge decorator Handbags Vendin (cartiassivas)
- 06/02/2012 19:09 Low-priced Advance Originator Handbags Purchasing with Uncon (cartiassivas)
- 06/02/2012 17:46 Subordinate Duplication Originator Handbags Stuff with Deliv (cartiassivas)
- 06/02/2012 16:26 Low-cost Matched Originator Handbags Vending with Unfettered (cartiassivas)
- 06/02/2012 15:05 Low-class Work hike xerox Schemer Handbags On proffer with U (cartiassivas)
- 06/02/2012 15:05 Order Benicar 10 mg without prescription, Cheapest Drugs Onl (inetryconydot)
- 06/02/2012 14:30 karen millen Sale (offenuptetoup)
- 06/02/2012 13:41 Second-rate Connect with Deviser Handbags Purchasing with Un (cartiassivas)
- 06/02/2012 12:17 Crummy Fax Architect Handbags Purchasing with Convenient mon (cartiassivas)
- 06/02/2012 10:51 Low-cost Counterpart Inner decorator Handbags Trading with U (cartiassivas)
- 06/02/2012 09:28 Low-cost Duplication Architect Handbags Vending with Unfette (cartiassivas)
- 06/02/2012 08:07 Second-rate Stab Land-locked decorator Handbags Vending with (cartiassivas)
- 06/02/2012 06:47 With a protuberance twopence Identical Inner decorator Handb (cartiassivas)
Closure of ‘Roller-Coaster Road’
The Closure of ‘Roller-Coaster Road’ and the Completion of Permanent Access Road from Sg Besi-Puchong Highway to Taman Puncak Jalil.
Pleased be informed that the Temporary Access Road from Sg Besi-Puchong Highway a.k.a ‘Roller Coaster Road’ will be closed from Thursday, 20th July 2006 to make way for the contruction of our Permanent Access Road from Sg Besi-Puchong Highway to Taman Puncak Jalil. With the closure, all light vehicles will be diverted to the Link Road to Bandar Kinrara and heavy vehicles to the Kota Perdana-Equine Park Access Road.
The road will remain closed until the completion of the Permanent Acces Road which is expected to be ready by early October 2006 (3 months from July 2006) as promised by our Developer Maxisegar/Talam Corporation.
The completion of the Permanent Access Road from Sg Besi-Puchong Highway is very crucial to our Developer, as this is one of the conditions set by Majlis Perbandaran Subang Jaya for the approval of the opening of the Link Road to Bandar Kinrara, and it must be ready by early October 2006. The progress of the contruction will be personally monitored by the YDP of MPSJ and our Assemblyman, Yang Berhormat Dato’ Dr. Haji Satim bin Diman.
The Persatuan Penduduk Taman Puncak Jalil will regularly update all Residents and the relevant parties such as MPSJ and our Assemblyman.
We hope all Residents will be patient and abide by the road signs.
Regards,
Zainuddin Zainal
President
Persatuan Penduduk Taman Puncak Jalil
Last Updated (Friday, 12 September 2008 08:05)


